Power for the region's data center build-out

Latin America led global data center inventory growth in Q1 2026 at 41.3% (CBRE, Global Data Center Trends 2026). The electrical supply chain has not kept pace.

The bottleneck is equipment

Data center projects in the region approach US$200 billion, with delays of up to 18 months on transformers, generators and chillers (Industrial Info, 29 October 2026). In Mexico, 70% of planned industrial corridors face energization delays past 2026 because of equipment backlogs (Mexico Business News, 20 October 2026).

What we supply

  • — Switchgear-to-equipment power cable assemblies, cut, terminated, tested and labelled.
  • — Low- and medium-voltage copper cable from the WTEC range.
  • — Dry-type transformers and copper busway, on request.
  • — Low- and medium-voltage switchgear, on request.

Working to an energization date?

Send us your bill of materials or drawings and we will reply with availability and lead times.