Wire, cable and power distribution for Latin America, made in El Salvador
Nearshore manufacturing, short lead times and one supplier from the cable to the disconnect box.
- Made in El Salvador
- CAFTA-DR origin
- Medium-voltage cable up to 35 kV
- Harnesses built to your drawings
- UL certification: in progress
- One supplier from the cable to the disconnect box
- Support in Spanish and English
- Quotes with availability and lead times
What we make
From the cable to the disconnect box: one regional supplier for your electrical project.
Wire and cable
Our first line at the Ateos plant produces aluminum cable for solar and distribution projects. The WTEC copper range completes the offer in low and medium voltage.
Transformers and busway
Transformers and distribution equipment carry some of the longest lead times in the region. We help you close that scope together with the cable and harnesses for your project.
Switchgear
We coordinate low- and medium-voltage switchgear and distribution boards together with cable and interconnect assemblies, so your electrical scope arrives complete.
Cable harness (4S)
Self-supporting from pile to pile: Plug-N-Play cable harnesses and trunk cable for solar DC collection, panel to inverter without combiner boxes.
Harnesses and assemblies
We turn your drawings into ready-to-install assemblies: cut to length, terminated with lugs and connectors, tested and labelled so your crew only has to connect.
Disconnect boxes
Built to take 4S trunk lines and isolate DC circuits safely in the field, with quick mounting on the structure or on feet.
Lead time is the advantage
Projects across Latin America wait months for equipment from Asia or backlogged US and EU makers. We manufacture in the region.
Speed
In-region plant: days by truck to Central America and short sea routes to the Caribbean and South America, versus months from Asia.
One source
Cable, 4S cable harnesses, harnesses and disconnect boxes from one supplier, with transformers and busway through partners.
Built to your drawings
Harnesses and assemblies cut, terminated, tested and labelled to your drawings, made in the region.
Trade access
CAFTA-DR origin for qualifying products into the US and Central America.
For projects that can't wait
We supply developers, EPCs, utilities and industry across Latin America.
Solar and renewables
String to inverter: PV cable, harnesses, the self-supporting 4S system and disconnect boxes, manufactured and coordinated from within the region.
Data centers
Latin America led global data center inventory growth in Q1 2026 at 41.3% (CBRE, Global Data Center Trends 2026). The electrical supply chain has not kept pace.
Utilities
To extend and reinforce distribution networks, we supply medium-voltage cable made in the region along with the WTEC copper range.
Construction
Feeders, service entrance and power wiring for commercial and industrial builds, delivered from within the region on your construction schedule.
Industrial
From control cable to harnesses built to OEM drawings, with production in the region and less reliance on distant imports.
From your bill of materials to your site
- 01
Send your request
Your bill of materials, drawings or specs, through the form, email or WhatsApp.
- 02
Technical review
We check gauges, voltages, standards and terminations, and confirm what your project needs.
- 03
Quote
We reply with availability, lead times and the origin of each product.
- 04
Manufacturing and shipping
We build and test at Ateos, and ship by road to Central America or by sea.
Manufacturing in El Salvador
From Cantón Ateos, Sacacoyo, we reach Central America by road in days and the Caribbean and South America on short sea routes.
First cable line: December 2026 – January 2027Altus Energy
Cantón Ateos, Lote 180, Polígono B, Sacacoyo, La Libertad, El SalvadorGet your project quoted today
Attach your bill of materials or drawings. We reply with availability and lead times.
Working to an energization date?
Send us your bill of materials or drawings and we will reply with availability and lead times.